Pre-Planning Determine your requirements: The AS Standard is the document created by SAE that establishes the baseline requirements fore conducting and documenting a first article inspection for the aerospace industry. AS was updated Rev B, the most recent version, is the standard used by most companies. Cras tincidunt ligula vitae quam faucibus dictum. Rotate stamps in any direction.
Uploader: | Kajinos |
Date Added: | 28 September 2011 |
File Size: | 39.46 Mb |
Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
Downloads: | 70846 |
Price: | Free* [*Free Regsitration Required] |
Whether AS form is required depends upon your customer. Upload your First Article to Net-Inspect. Characteristics not defined on the 2D drawing can be extracted from the 3D model, thus including n for nominal dimensions. Field-based data or attributes may be embedded into balloons or QA stamps.

What is AS Standard? Inclusion of 3D for characteristic accountability, extraction of data, inspection and verification. Your Feature Complete Solution! A partial or delta FAI is required when: These are to be measured, inspected, tested and verified as one would do on the 2D drawing.
Donec interdum venenatis lorem in sodales.
What are the differences between AS Rev A and Rev B?
Color changer — Choose from 20 different ballooning ink stamping inks. Automatically pick up dimension values from drawings. No changes in process, tool, or location No design change No materials or source change Learn more about when a first article inspection is required. Create inspection plan Balloon part drawing: Does AS require the use of the AS form? Document the requirements to be inspected traceable to the balloon number. The AS Standard is the document created by SAE that establishes the baseline requirements fore conducting and documenting a first article inspection for the aerospace industry.
First Article Inspection | AS Software – MetEQ
Learn more about the evolution rve AS since it was first released in and the differences between Rev A and Rev B. An AS first article inspection report is valid for 2 years after the initial run as long as: Something Powerful Tell The Reader More The headline and subheader tells us what you're offeringand the form header closes the deal.

Over here you can explain why your offer is so great it's worth filling ws9102 a form for. Learn more about when a First Article Inspection is required.
By using the website you consent to our use of these cookies. Inventor DWG format support including Inventor Product Accountability All material and process specifications, as well as any special processes and functional testing defined as design requirements, must be accounted for on Form 2. Assemblies are also included for the 3D model for assembly-level FAIs.
The source drawing remains untouched by the stamping as1902 markup operations. A change in design potentially affects form, fit, or function A change in manufacturing source, process, inspection method, location of manufacturer, tooling, or material A change to numerical control programs or translation to another media potentially affects form, fit, or function Learn more about when a first article inspection is required.
Need help? You've come to the right place
Reg is the output of a FAI, first article inspection, which is a set of actions that validates a manufacturing process.
Learn more about when a first article inspection is required. When should I conduct a First Article Inspection? An inspection drawing or model is required ss9102 all inspection characteristics defined using CAD annotations are clearly identified with uniquely numbered inspection balloons. This section also includes reference characteristics that are on 3D models and can be for information only and are typically not tolerances.
The numbers on the inspection balloons must correspond to the characteristic numbers on Form 3.
Quick, easy and lowest priced FAI Software with one-time fee for perpetual license!
Comments
Post a Comment